WINSTA® Refurbishment Downtime Calculator
WINSTA® REFURBISHMENT DOWNTIME CALCULATOR

How much sooner could your building be operational?

Estimate how faster, pluggable installation with WINSTA® could reduce refurbishment downtime, shorten disruption and help spaces return to use sooner.

Your refurbishment project

Estimated number of days the area could be disrupted using traditional wiring.
Use working hours, trading hours or occupied hours per day.
%
Recommended starting point: 70%
Office refurbishments are often phased around occupied spaces. WINSTA® can support faster installation and reduced disruption.
WINSTA® can support installation time savings of up to 70%, depending on project scope, access, design standardisation and prefabrication level.

Your estimated downtime reduction

Potential downtime avoided 5.5 days
Hours of disruption avoided 44 hours
New disruption period 4.5 days
Back operational sooner 5.5 days
Downtime reduction 55%
WINSTA® could help reduce disruption and get the space back into use sooner.
Based on your inputs, the refurbishment area could be operational again significantly earlier than with traditional wiring.
Next step: Use this estimate to discuss how pluggable installation, prefabrication and faster commissioning could reduce refurbishment disruption on your project.

Indicative estimate only. Actual time savings depend on project scope, installation method, building access, labour availability, prefabrication level, testing requirements and site conditions.

What could you save on your next job?